Medline Distribution Center

Specs

Project: Medline Distribution Center
Location: Chesterfield, VA
Category:
Client: Alston Construction
Contract Value: $3,200,000
Completion Date: 2014
Job Duration: 9 Months
Engineer: Timmons Group

About this project

The Medline Distribution Center is a 500,000 SQFT medical distribution facility sitting on forty acres in the Meadowville Technology Park in Chesterfield, Virginia. Calciment and lime stabilization was utilized on the half million square foot building pad due to the intense schedule during the winter. Liesfeld installed a 60’x30′ Contech O Series Con-span at the entrance road. The project also included several road improvements to Meadowville Technology Parkway with various turn-lanes. The project utilized our Green Solutions by using over 20,000 tons of crushed concrete in lieu of aggregate base for the recycled material credit. The design-build project featured large truck courts, a sizeable concrete package, and a large sediment basin.

LEED Silver Project

Awards
Best Industrial Finalist – 2015 GRACRE Awards

 

 

 

Services