West Broad Marketplace

West Broad Marketplace is a large commercial development located on a 62-acre site in the Short Pump Shopping Area in Henrico, Virginia. Liesfeld provided a full site preparation package including demolition, clearing, erosion control, grading, soil stabilization, large-scale retaining walls, rock excavation, storm sewer, water, sanitary, VDOT right-of-way improvements, site concrete, and asphalt pavement. West […]

Aldi Distribution Center

The Aldi Distribution Center is a 584,000 SQFT refrigerated distribution center located on an 80-acre site in Dinwiddie, Virginia. Liesfeld provided a full site preparation package including site demolition, clearing, erosion control, grading, retaining walls, storm sewer, water, sanitary, site concrete, and asphalt pavement. The facility also serves as Aldi, Inc’s East Coast Regional Headquarters. […]

Niagara Bottling Facility

The Niagara Bottling Facility is a 600,000 SQFT Manufacturing and Bottling Facility located on a 62-acre site in Chesterfield, Virginia. Liesfeld provided a full site preparation package including site demolition, clearing, erosion control, grading, soil stabilization, storm sewer, water, sanitary, site concrete and asphalt pavement.               .

Stonehenge

In 2016, Liesfeld completed the thirty-seven-acre commercial development Stonehenge located in Midlothian, Virginia. The project features a Wegman’s grocery store and several other retail out parcels. Liesfeld provided a total site preparation package for the project including clearing, erosion control, grading, utilities, stone placement, site concrete and asphalt paving. The project also included a Route […]

Stone Brewery East Coast Facility

The Stone Brewery East Coast Facility is a 216,000 SQFT production brewery and distribution center located on a 16-acre brownfield site in Richmond, Virginia. Liesfeld provided the project a mass grading package only and focused on an intense building pad delivery. The project also featured road work, stream restoration work on the property, and prepping […]

Dominion Commerce Road Laydown Yard

The Dominion Commerce Road Laydown Yard was a fifteen-acre stone laydown yard project located in Richmond, Virgina for the end user HD Supply & Dominion Resources. Liesfeld approached the project with a wide array of services to help save the project cost and time. The project utilized over 40,000 tons of crushed concrete in the […]

Vulcan Materials – Royal Stone Overburden

In 2014, Liesfeld moved 225,000 cubic yards of overburden material at Vulcan Material’s Royal Stone Quarry in Rockville, Virginia. Liesfeld also installed several thousand feet of V Ditches that had mixtures of rip rap and slope stabilization matting. The project utilized Liesfeld’s mining support operations in moving over 10,000 cubic yards per day.         […]

Magnolia Green Stream Restoration

In 2014, Liesfeld completed the 4,300-foot Magnolia Green Stream Restoration project. The project featured over 6,500 live stakes, 3,330 plantings, 2 stream crossings, 2,200 feet of toewood, and 103 structures. The project had limited access through an existing neighbourhood that entailed complex sequencing and staging to limit impact to homeowners. The project also involved setting […]

Dulles International Airport Maintenance Facility

In 2014, Liesfeld moved 900,000 Cubic Yards of earthen material at the Dulles International Airport. The project entailed relocating a stockpile generated from years of runway construction out of the way at the new Metro Railway Maintenance Facility at the end of the new Silver Metro Line. The grading crews averaged over 14,000 Cubic Yards […]

Medline Distribution Center

The Medline Distribution Center is a 500,000 SQFT medical distribution facility sitting on forty acres in the Meadowville Technology Park in Chesterfield, Virginia. Calciment and lime stabilization was utilized on the half million square foot building pad due to the intense schedule during the winter. Liesfeld installed a 60’x30′ Contech O Series Con-span at the […]

Craney Island West Shoreline Protection

In December 2013, Liesfeld completed the Craney Island West Shoreline Protection project located in Portsmouth, Virginia. The project is located on 2,500 acres on the James River next to the Port of Virginia and consisted on moving 150,000 cubic yards of material from the eastern side of the island to the western side of the […]

Skipwith Elementary Stream Restoration

In 2012, Liesfeld completed the 1,650 linear foot Skipwith Elementary Stream Restoration Project located in Henrico, Virginia. The project included stream channel grading, grading, construction of in-stream structures, seeding, planting, construction of trails, rain gardens, installation of stabilization blankets, construction of learning area and complex erosion control sequence. The project was constructed under very wet […]

Lieutenant Run Stream Restoration

In 2012, Liesfeld completed the Lieutenant Run Stream Restoration project. The project consisted of 1,235 LF of stream channel construction, complex selective clearing, 5,000 SY of soil stabilization matting, relocation of utilities, installation of 175 LF of pre-engineered bottomless culvert, and  30 LF of retaining wall.